Removing
1. Turn away 3 bolts of fastening of the heat exchanger of system EGR.
2. Loosen the clamp that secures the tube of the exhaust gas recirculation system to the heat exchanger and remove the clamp from the heat exchanger.
3. Turn away 2 bolts of fastening of a heat-shielding screen and tubes of system EGR to a final collector.
4. Remove the heat shield from the manifold.
5. Remove the tube of the EGR system with a clamp.
6. Loosen the clamp and remove the oil drain hose from the turbocharger.
7. Turn away a bolt of fastening of a turbocharger to a basic arm.
8. Turn away 12 nuts of fastening of a final collector, remove a collector and utilize a lining.
9. Turn away 3 bolts of fastening of a turbocharger to a final collector. Dispose of the gasket.
Installation
1. Wipe the intake manifold and mating surface.
2. Install the turbocharger on a new gasket and tighten the bolts of its fastening. Tightening torque 50 Nm.
3. Install the exhaust manifold to the cylinder head using a new gasket.
4. Screw bolts of fastening of a final collector and tighten them. Tightening torque 24 Nm.
5. Install the bolt securing the turbocharger to the support bracket and tighten it. Tightening torque 25 Nm.
6. Attach the oil drain hose and secure it with a clamp.
7. Wipe the tube of the exhaust gas recirculation system and mating surface.
8. Install the EGR pipe (EGR), put on the clamp, but do not fully tighten it yet.
9. Put a heat-insulating screen on the collector and tighten the bolts of the tube of the exhaust gas recirculation system (EGR) and heat shield. Tightening torque 25 Nm.
10. Tighten the clamp that secures the EGR system tube to the system valve.
11. Tighten the EGR heat exchanger mounting bolts (EGR). Tightening torque 25 Nm.
Comments on this article