NOTE: The steps in this procedure may be part of the installation procedure.
Removing
1. Disconnect the battery ground wire. Refer to procedure: Specifications (414-00 Charging system - General information, Specifications).
2. Raise and support the vehicle.
WARNING: Place axle stands under the vehicle.
3. Remove the fuel-fired auxiliary heater. Refer to Procedure: Fuel Auxiliary Heater (412-02 Additional climate control, Removal and installation).
4. Tightening torque: 10 Nm
5.
6.
7. Tightening torque: 7.5 Nm
8. Tightening torque: 10 Nm
9.
10.
11.
12.
13. Tightening torque: 7 Nm
NOTE: Remove and discard gasket.
Installation
1. Install the elements in the reverse order of disassembly.
Comments on this article