Installation
1. Install the transfer case with an assistant.
- Clean the contact surfaces of the parts.
- Lubricate input shaft splines with 'Weicon TL7391' grease.
- Install the sealing ring.
- Align the fuel line support bracket.
- Using the special tool, tighten the bolts to a torque of 45 Nm.
2. Connect the breather line.
3. Position the fuel line support bracket.
- Tighten the bolts with a tightening torque of 10 Nm.
- Fasten the fuel lines.
- Place the selector cable in the guide bracket.
5. Attach the wiring harness to the transfer case.
- Fasten with a clip.
- Tighten the bolts with a tightening torque of 25 Nm.
- Clean the contact surfaces of the parts.
- Tighten the bolts with a tightening torque of 60 Nm.
8. Install the front driveshaft. For more information refer to Front Drive Shaft - 4.0L (47.15.02)
9. Connect a wire of weight to the storage battery. For more information refer to Specification.
10. Using T4, recalibrate the new transfer case.
Comments on this article